Sunday, January 16, 2011

Mandingo And White Guy

Side A

To place the last 6 curved plates of the left side of the boat, we spent the whole day, but the result is excellent. Towards the 17's "workers' low cost (is satisfied , ribs, sausages, bread and wine) have gone right home, we stayed mum 2 to finish installing the last slab in order to fix and clean the yard, we moved the welding on the starboard side and we were 40 minutes see our work in solitude. At the end of each small goal, enthusiasm leads us to fly our minds, takes over after a little 'depressed thinking about how much remains to be done. Today they have helped once again: Richard, Gianni and Flavio and Fabio took a day off. Fabio the archtetto rose to greet us even though it was in excellent condition due to a bad cold, Daniele seems to have disappeared (again, please, we miss you).
All workers who are giving us an invaluable contribution, we ask a little 'patience, missing for a little while and then' leave you alone, we do welding work on their own.
In the picture you can see a very interesting trick, fast and low cost.
Plese, let a donation.

Now enjoy with us the Side A.


0 comments:

Post a Comment